Crumlin, pentreygroes farm, crumlin pv solar park
Sunventures 1 ltd at Rassau Gsp
NGED Embedded Capacity Register, August 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 25 Apr 2016
- Status
- Connected
- Customer
- Sunventures 1 ltd
- Site name
- Crumlin, pentreygroes farm, crumlin pv solar park
- Address
- Upper Pant-Ysgawen Farm, Maes-Yr-Haf Lane, Croespenmaen, Crumlin, Newport, Gwent, NP11 3EG
- Grid reference
- Easting 320357, northing 197701
- Licence area
- South Wales
- Grid supply point
- Rassau Gsp
- Bulk supply point
- Crumlin
- Primary substation
- Crumlin Primary
- Connection voltage
- 11 kV
- Technology group
- Solar
- Energy source 1
- Solar, Photovoltaic: 3.64 MW registered
- Registered capacity
- 3.64 MW
- Maximum export capacity
- 3.618 MW
- Maximum import capacity
- 0.038 MW
- Flexible connection
- Not published by NGED
- In a connection queue
- Not published by NGED
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by NGED
- Transmission reinforcement reference
- Not published by NGED
- Export MPAN
- 2100041352550
- Import MPAN
- 2100041352540
- Last updated
- 6 Aug 2026
- Tracked since
- August 2026 edition
Change history
Tracked since the August 2026 edition, the only one QueueWatch holds so far.
Changes to the details QueueWatch tracks, newest first.
Changes will show from the next edition.
Also at Rassau Gsp
GSP view37 other sites at this grid supply point in the August 2026 edition, 4 of them at Crumlin Primary, the same primary substation. In all, the sites here total 575 MW: 202 MW connected, 373 MW accepted to connect.
- Crumlin, pen-y-fan ind est, plateau 1, wind turbinesOakdale wind farm limited, Wind, Crumlin Primary primaryConnected4 MW
- Crumlin, manmoel, penyrheollas farm, solarPenyrheollas solarfield limited, Solar, Crumlin Primary primaryConnected3.72 MW
- Crumlin, manmoel, darren farm solarMillclose solar limited, Solar, Crumlin Primary primaryConnected1.5 MW
- Crumlin, pen-y-fan ind est, abingdon flooring ltdAbingdon flooring limited, Wind, Crumlin Primary primaryConnected1.5 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?