Chadwell park farm
Peter booth electrical contractors ltd at Cellarhead 132Kv
NGED Embedded Capacity Register, August 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 24 Sep 2026
- Status
- Accepted to connect
- Customer
- Peter booth electrical contractors ltd
- Site name
- Chadwell park farm
- Address
- Great Chatwell, Newport, Shropshire, TF10 9BN
- Grid reference
- Easting 3792220, northing 3133490
- Licence area
- West Midlands
- Grid supply point
- Cellarhead 132Kv
- Bulk supply point
- Meaford C 132Kv S Stn
- Primary substation
- Gnosall 33 11Kv S Stn
- Connection voltage
- 11 kV
- Technology group
- Solar
- Energy source 1
- Solar, Photovoltaic: 1.47 MW registered
- Registered capacity
- 1.47 MW
- Change to maximum export capacity
- 0.28 MW
- Change to maximum import capacity
- 1 MW
- Flexible connection
- Not published by NGED
- In a connection queue
- Not published by NGED
- Date accepted
- 20 Jul 2026
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by NGED
- Transmission reinforcement reference
- Not published by NGED
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 6 Aug 2026
- Tracked since
- August 2026 edition
Change history
Tracked since the August 2026 edition, the only one QueueWatch holds so far.
Changes to its status, capacity, technology or customer, newest first.
Changes will show from the next edition.
Also at Cellarhead 132Kv
GSP view40 other sites at this grid supply point in the August 2026 edition, 1 of them at Gnosall 33 11Kv S Stn, the same primary substation. In all, the sites here total 1.2 GW: 0.2 GW connected, 1 GW accepted to connect.
- Lower reule farmLower reule bioenergy ltd, Other or not stated, Gnosall 33 11Kv S Stn primaryConnected0.8 MW
- Land at armshead farm, ref cellarhead bessConrad energy (developments) ii limited, StorageAccepted99 MW
- Chatterley whitfield, outclough farm, chatterley whitfield energy storageChatterley energy storage limited, StorageAccepted49.9 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose