Burton site c battery wellington road

Frp mercia holdco 2 limited at Drakelow 132Kv

NGED Embedded Capacity Register, August 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
1 Aug 2025
Status
Connected
Customer
Frp mercia holdco 2 limited
Site name
Burton site c battery wellington road
Address
Battery Site Site C, Wellington Road, Burton on trent, DE14 2DW
Grid reference
Easting 423400, northing 322466
Licence area
East Midlands
Grid supply point
Drakelow 132Kv
Bulk supply point
Burton South 33Kv S Stn
Primary substation
Wellington St 33 11Kv S Stn
Connection voltage
11 kV
Technology group
Storage
Energy source 1
Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 1.2 MW registered
Registered capacity
1.2 MW
Maximum export capacity
0.95 MW
Maximum import capacity
0.95 MW
Flexible connection
Not published by NGED
In a connection queue
Not published by NGED
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by NGED
Transmission reinforcement reference
Not published by NGED
Export MPAN
1170002134542
Import MPAN
1170002134533
Last updated
6 Aug 2026
Tracked since
August 2026 edition

Change history

Tracked since the August 2026 edition, the only one QueueWatch holds so far.

Changes to its status, capacity, technology or customer, newest first.

Changes will show from the next edition.

Also at Drakelow 132Kv

GSP view

40 other sites at this grid supply point in the August 2026 edition, 3 of them at Wellington St 33 11Kv S Stn, the same primary substation. In all, the sites here total 602 MW: 167 MW connected, 435 MW accepted to connect.

See all 40

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose