SHORE TOP FARM BESS

LOW CARBON ALLIANCE at KEARSLEY 132 GSP

ENWL Embedded Capacity Register 2 – 1MW and above, October 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not stated
Status
Accepted to connect
Planning consent
Granted 20 Nov 2025
Bury, reference 71888 · Source: REPD
Customer
LOW CARBON ALLIANCE
Site name
SHORE TOP FARM BESS
Address
SHORE TOP FARM, KEARSLEY LANE, RADCLIFFE, BURY, M26 1FA
Grid reference
Easting 377460, northing 406004
Licence area
North West England (ENWL)
Grid supply point
KEARSLEY 132 GSP
Bulk supply point
Not stated
Primary substation
RADCLIFFE
Connection voltage
11 kV
Technology group
Storage
Energy source 1
STORED ENERGY (ALL STORED ENERGY IRRESPECTVE OF THE ORIGINAL ENERGY SOURCE), STORAGE - ELECTROCHEMICAL (BATTERIES): 11 MW registered
Registered capacity
11 MW
Maximum export capacity
0 MW
Maximum import capacity
0 MW
Change to maximum export capacity
11 MW
Change to maximum import capacity
11 MW
Flexible connection
No
In a connection queue
No
Date accepted
1 Dec 2021
Date connected
Not stated
Distribution reinforcement reference
Not published by ENWL
Transmission reinforcement reference
Not stated
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
14 Mar 2024
Tracked since
May 2026 edition

What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?

Change history

Tracked since the May 2026 edition, across 3 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at KEARSLEY 132 GSP

GSP view

26 other sites at this grid supply point in the October 2026 edition. In all, the sites here total 246 MW: 151 MW connected, 95 MW accepted to connect.

  • COAL PIT LANEPULSE CLEAN ENERGY, StorageConnected30 MW
  • SLACK LANEFPC ELECTRIC LAND, StorageAccepted30 MW
  • BARKERS FARMSTOR 125 LTD, Gas and other fossilAccepted21.053 MW
  • LASCAR WORKSStorageConnected20 MW
  • LONGLEY LANEBURY POWER LIMITED, Gas and other fossilConnected19.8 MW
  • BURY STOR 1IRWELL POWER LIMITED, Gas and other fossilConnected16 MW
  • AGECROFTELECTRICITY NORTH WEST (CONSTRUCTION & MAINTENANCE) LTD, Gas and other fossilConnected15.789 MW
  • SLACK LANE, WESTHOUGHTONELECTRICITY NORTH WEST (CONSTRUCTION & MAINTENANCE) LTD, StorageAccepted15.789 MW

See all 26

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?

Planning consent

The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.

How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.