MEDLOCK BESS 30MW

YLEM ENERGY LTD at DROYLSDEN

ENWL Embedded Capacity Register 2 – 1MW and above, October 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not stated
Status
Accepted to connect
Planning consent
Granted on appeal 21 Oct 2025
Oldham, reference FUL/353405/24 · Source: REPD
Customer
YLEM ENERGY LTD
Site name
MEDLOCK BESS 30MW
Address
LAND ON THE SOUTH EAST SIDE OF MEDLOCK ROAD, FAILSWORTH, MANCHESTER, GREATER MANCHESTER, M35 9WG
Grid reference
Easting 390393, northing 400017
Licence area
North West England (ENWL)
Grid supply point
DROYLSDEN
Bulk supply point
STALYBRIDGE
Primary substation
Not stated
Connection voltage
33 kV
Technology group
Storage
Energy source 1
STORED ENERGY (ALL STORED ENERGY IRRESPECTIVE OF THE ORIGINAL ENERGY SOURCE), STORAGE - ELECTROCHEMICAL (BATTERIES): 20 MW registered
Registered capacity
20 MW
Maximum export capacity
0 MW
Maximum import capacity
0 MW
Change to maximum export capacity
30 MW
Change to maximum import capacity
30.5 MW
Flexible connection
No
In a connection queue
Not stated
Date accepted
21 Dec 2023
Date connected
Not stated
Distribution reinforcement reference
Not published by ENWL
Transmission reinforcement reference
Not stated
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
2 Jan 2024
Tracked since
May 2026 edition

What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?

Change history

Tracked since the May 2026 edition, across 3 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at DROYLSDEN

GSP view

No other site in ENWL’s October 2026 edition is at this grid supply point.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?

Planning consent

The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.

How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.