MANCHESTER MAIL CENTRE

ROYAL MAIL at WHITEGATE GSP

ENWL Embedded Capacity Register 2 – 1MW and above, October 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
1 Jun 2012
Status
Connected
Customer
ROYAL MAIL
Site name
MANCHESTER MAIL CENTRE
Address
77 OLDHAM ROAD, 77 OLDHAM ROAD, MANCHESTER, GREATER MANCHESTER, M4 5AA
Grid reference
Easting 385021, northing 398985
Licence area
North West England (ENWL)
Grid supply point
WHITEGATE GSP
Bulk supply point
RED BANK
Primary substation
ANCOATS NORTH T11 & T12
Connection voltage
6.6 kV
Technology group
Gas and other fossil
Energy source 1
FOSSIL - OIL, ENGINE (COMBUSTION / RECIPROCATING): 1.08 MW registered
Energy source 2
FOSSIL - GAS, ENGINE (COMBUSTION / RECIPROCATING): 0.285 MW registered
Registered capacity
1.365 MW
Maximum export capacity
0.95 MW
Maximum import capacity
1.188 MW
Change to maximum import capacity
0 MW
Flexible connection
No
In a connection queue
Not stated
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by ENWL
Transmission reinforcement reference
Not stated
Export MPAN
1640000049447
Import MPAN
1620001213390
Last updated
6 Dec 2021
Tracked since
May 2026 edition

Change history

Tracked since the May 2026 edition, across 3 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at WHITEGATE GSP

GSP view

23 other sites at this grid supply point in the October 2026 edition. In all, the sites here total 359 MW: 79 MW connected, 280 MW accepted to connect.

See all 23

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?