LYMES WOOD LANDFILL SITE

ENOVERT NORTH LIMITED at BOLD

ENWL Embedded Capacity Register 2 – 1MW and above, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
12 May 2006
Status
Connected
Customer
ENOVERT NORTH LIMITED
Site name
LYMES WOOD LANDFILL SITE
Address
VISTA ROAD, VISTA ROAD, ST HELENS, MERSEYSIDE, WA11 0RN
Grid reference
Easting 357156, northing 396601
Licence area
North West England (ENWL)
Grid supply point
BOLD
Bulk supply point
GOLBORNE
Primary substation
NEWTON LE WILLOWS
Connection voltage
11 kV
Technology group
Bioenergy and waste
Energy source 1
BIOFUEL - LANDFILL GAS, ENGINE (COMBUSTION / RECIPROCATING): 1.165 MW registered
Registered capacity
1.165 MW
Maximum export capacity
2.375 MW
Maximum import capacity
0.143 MW
Change to maximum import capacity
0 MW
Flexible connection
No
In a connection queue
Not stated
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by ENWL
Transmission reinforcement reference
Not stated
Export MPAN
1620001683365
Import MPAN
1620001683356
Last updated
6 Dec 2021
Tracked since
May 2026 edition

Change history

Tracked since the May 2026 edition, across 2 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at BOLD

GSP view

9 other sites at this grid supply point in the September 2026 edition, 1 of them at NEWTON LE WILLOWS, the same primary substation. In all, the sites here total 57.1 MW: 43.5 MW connected, 13.6 MW accepted to connect.

See all 9

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose