QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Low Dyke

Pengen at HARKER ENWL SGTS 1 2 3A 4 / HUTTON GSP GROUP

ENWL Embedded Capacity Register 2 – 1MW and above, May 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not stated
Status
Accepted to connect
Customer
Pengen
Site name
Low Dyke
Address
Low Dyke, Calthwaite, Penrith, Cumbria, CA11 9PS
Grid reference
Easting 346152, northing 538804
Licence area
North West England (ENWL)
Grid supply point
HARKER ENWL SGTS 1 2 3A 4 / HUTTON GSP GROUP
Bulk supply point
PENRITH & SHAP
Primary substation
HUTTON END & SKELTON C
Connection voltage
11 kV
Technology group
Storage
Energy source 1
Stored Energy (all stored energy irrespectve of the original energy source), Storage - Other: 6 MW registered, 1 hours of storage
Registered capacity
6 MW
Change to maximum export capacity
5.7 MW
Change to maximum import capacity
Not stated
Flexible connection
No
In a connection queue
Not stated
Date accepted
3 Aug 2017
Date connected
Not stated
Distribution reinforcement reference
Not published by ENWL
Transmission reinforcement reference
Not stated
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
6 Dec 2021
Tracked since
May 2026 edition

Change history

Found in the May 2026 edition only.

Another record at this location is on a separate page.

Changes to its status, capacity, technology or customer, newest first.

  • September 2026 edition
    Not found in this edition by its MPAN, grid reference or name and postcode

No changes to show: it has been found in one edition.

Also at HARKER ENWL SGTS 1 2 3A 4 / HUTTON GSP GROUP

GSP view

127 other sites at this grid supply point in the September 2026 edition, 4 of them at HUTTON END & SKELTON C, the same primary substation. In all, the sites here total 2.8 GW: 0.8 GW connected, 2 GW accepted to connect.

See all 127

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose