KIRKSANTON AIRFIELD, NORTH LANE
UNITED BISCUITS (UK) LIMITED at BREDBURY GSP
ENWL Embedded Capacity Register 2 – 1MW and above, October 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 1 Jun 2016
- Status
- Connected
- Customer
- UNITED BISCUITS (UK) LIMITED
- Site name
- KIRKSANTON AIRFIELD, NORTH LANE
- Address
- CROSSLEY ROAD, MANCHESTER, GREATER MANCHESTER, M19 2SD
- Grid reference
- Easting 387951, northing 392960
- Licence area
- North West England (ENWL)
- Grid supply point
- BREDBURY GSP
- Bulk supply point
- VERNON PARK
- Primary substation
- HEATON NORRIS
- Connection voltage
- 6.6 kV
- Technology group
- Gas and other fossil
- Energy source 1
- FOSSIL - GAS, ENGINE (COMBUSTION / RECIPROCATING): 1.267 MW registered
- Registered capacity
- 1.267 MW
- Maximum export capacity
- 0 MW
- Maximum import capacity
- 4.845 MW
- Change to maximum import capacity
- 0 MW
- Flexible connection
- No
- In a connection queue
- Not stated
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by ENWL
- Transmission reinforcement reference
- Not stated
- Export MPAN
- Not stated
- Import MPAN
- 1600000133331
- Last updated
- 6 Dec 2021
- Tracked since
- May 2026 edition
Change history
Tracked since the May 2026 edition, across 3 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at BREDBURY GSP
GSP view26 other sites at this grid supply point in the October 2026 edition, 2 of them at HEATON NORRIS, the same primary substation. In all, the sites here total 455 MW: 75 MW connected, 380 MW accepted to connect.
- LAND AT HERROD AVENUEMJS GRID SERVICES LTD, Gas and other fossil, HEATON NORRIS primaryConnected4.5 MW
- HEREFORD STREETUNITED BISCUITS (UK) LIMITED, Gas and other fossil, HEATON NORRIS primaryAccepted1.267 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?