QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

HM AGECROFT GAS PEAKING PLANT

ENWL COMA at KEARSLEY

ENWL Embedded Capacity Register 2 – 1MW and above, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not stated
Status
Accepted to connect
Customer
ENWL COMA
Site name
HM AGECROFT GAS PEAKING PLANT
Address
HM AGECROFT, AGECROFT ROAD, PENDLEBURY, MANCHESTER, M27 8FB
Grid reference
Easting 380244, northing 402009
Licence area
North West England (ENWL)
Grid supply point
KEARSLEY
Bulk supply point
AGECROFT
Primary substation
Not stated
Connection voltage
33 kV
Technology group
Gas and other fossil
Energy source 1
FOSSIL - GAS, ENGINE (COMBUSTION / RECIPROCATING): 15 MW registered
Registered capacity
15 MW
Maximum export capacity
0 MW
Maximum import capacity
0 MW
Change to maximum export capacity
15 MW
Change to maximum import capacity
1.5 MW
Flexible connection
No
In a connection queue
No
Date accepted
6 Apr 2023
Date connected
Not stated
Distribution reinforcement reference
Not published by ENWL
Transmission reinforcement reference
Not stated
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
11 May 2023
Tracked since
May 2026 edition

Change history

Tracked since the May 2026 edition, across 2 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at KEARSLEY

GSP view

4 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 60.8 MW: 60.8 MW accepted to connect.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose