DISTINGTON LANDFILL SITE
INFINIS ENERGY SERVICES LIMITED at HARKER ENWL SGTS 1 2 3A 4 / HUTTON GSP GROUP
ENWL Embedded Capacity Register 2 – 1MW and above, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 1 Dec 1998
- Status
- Connected
- Customer
- INFINIS ENERGY SERVICES LIMITED
- Site name
- DISTINGTON LANDFILL SITE
- Address
- PITTWOOD ROAD, LILLYHALL INDUSTRIAL ESTATE, LILLYHALL, WORKINGTON, CUMBRIA, CA14 4JP
- Grid reference
- Easting 301888, northing 524458
- Licence area
- North West England (ENWL)
- Grid supply point
- HARKER ENWL SGTS 1 2 3A 4 / HUTTON GSP GROUP
- Bulk supply point
- STAINBURN & SIDDICK
- Primary substation
- HDA NO1 & HDA NO2
- Connection voltage
- 11 kV
- Technology group
- Bioenergy and waste
- Energy source 1
- BIOFUEL - LANDFILL GAS, ENGINE (COMBUSTION / RECIPROCATING): 2.6 MW registered
- Registered capacity
- 2.6 MW
- Maximum export capacity
- 0.95 MW
- Maximum import capacity
- 0.038 MW
- Change to maximum import capacity
- 0 MW
- Flexible connection
- No
- In a connection queue
- Not stated
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by ENWL
- Transmission reinforcement reference
- Not stated
- Export MPAN
- 1620000366740
- Import MPAN
- 1600000173760
- Last updated
- 6 Dec 2021
- Tracked since
- May 2026 edition
Change history
Tracked since the May 2026 edition, across 2 editions.
Changes to its status, capacity, technology or customer, newest first.
No change to its status, capacity, technology or customer.
Also at HARKER ENWL SGTS 1 2 3A 4 / HUTTON GSP GROUP
GSP view126 other sites at this grid supply point in the September 2026 edition, 4 of them at HDA NO1 & HDA NO2, the same primary substation. In all, the sites here total 2.8 GW: 0.8 GW connected, 2 GW accepted to connect.
- MOOR HOUSE SOLAR PARKMOOR HOUSE FARM SOLAR LIMITED, Solar, HDA NO1 & HDA NO2 primaryConnected4.587 MW
- DISTINGTON LANDFILL SITEINFINIS ENERGY SERVICES LIMITED, Bioenergy and waste, HDA NO1 & HDA NO2 primaryConnected2.319 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose