QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

DANES MOSS LANDFILL SITE 3

INFINIS ENERGY SERVICES LIMITED at MACCLESFIELD 33 GSP

ENWL Embedded Capacity Register 2 – 1MW and above, October 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
1 May 2008
Status
Connected
Customer
INFINIS ENERGY SERVICES LIMITED
Site name
DANES MOSS LANDFILL SITE 3
Address
GAWSWORTH ROAD, GAWSWORTH, MACCLESFIELD, CHESHIRE, SK11 9QJ
Grid reference
Easting 390238, northing 371611
Licence area
North West England (ENWL)
Grid supply point
MACCLESFIELD 33 GSP
Bulk supply point
Not stated
Primary substation
S.W. MACCLESFIELD
Connection voltage
11 kV
Technology group
Bioenergy and waste
Energy source 1
BIOFUEL - LANDFILL GAS, ENGINE (COMBUSTION / RECIPROCATING): 1.006 MW registered
Registered capacity
1.006 MW
Maximum export capacity
0.976 MW
Maximum import capacity
0.048 MW
Change to maximum import capacity
0 MW
Flexible connection
No
In a connection queue
Not stated
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by ENWL
Transmission reinforcement reference
Not stated
Export MPAN
1630000489927
Import MPAN
1630000489918
Last updated
6 Dec 2021
Tracked since
May 2026 edition

Change history

Tracked since the May 2026 edition, across 3 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at MACCLESFIELD 33 GSP

GSP view

6 other sites at this grid supply point in the October 2026 edition, 2 of them at S.W. MACCLESFIELD, the same primary substation. In all, the sites here total 66.5 MW: 59 MW connected, 7.5 MW accepted to connect.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?