BARROW FLOATING SOLAR
NET ZERO MARINE LIMITED at HARKER/HUTTON
ENWL Embedded Capacity Register 2 – 1MW and above, October 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- Not stated
- Status
- Accepted to connect
- Customer
- NET ZERO MARINE LIMITED
- Site name
- BARROW FLOATING SOLAR
- Address
- BARROW-IN-FURNESS, CUMBRIA, LA14 2GR
- Grid reference
- Easting 319778, northing 467320
- Licence area
- North West England (ENWL)
- Grid supply point
- HARKER/HUTTON
- Bulk supply point
- STAINBURN & SIDDICK
- Primary substation
- SIDDICK
- Connection voltage
- 11 kV
- Technology group
- Storage
- Energy source 1
- PV & BESS, PV & BESS: 15 MW registered
- Registered capacity
- 15 MW
- Maximum export capacity
- 0 MW
- Maximum import capacity
- 0 MW
- Change to maximum export capacity
- 7.26 MW
- Change to maximum import capacity
- 7.26 MW
- Flexible connection
- Not stated
- In a connection queue
- Not stated
- Date accepted
- 5 Jan 2026
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by ENWL
- Transmission reinforcement reference
- Not stated
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 13 Feb 2026
- Tracked since
- May 2026 edition
What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?
Change history
Tracked since the May 2026 edition, across 3 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at HARKER ENWL SGTS 1 2 3A 4 / HUTTON GSP GROUP
GSP view126 other sites at this grid supply point in the October 2026 edition, 4 of them at SIDDICK, the same primary substation. In all, the sites here total 2.8 GW: 0.8 GW connected, 2.0 GW accepted to connect.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?