ASLAND WALKS ENERGY PARK

GA PET FOOD PARTNERS GROUP LIMITED at PENWORTHAM WEST

ENWL Embedded Capacity Register 2 – 1MW and above, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not stated
Status
Accepted to connect
Customer
GA PET FOOD PARTNERS GROUP LIMITED
Site name
ASLAND WALKS ENERGY PARK
Address
GA PLOCKS FARM, BRETHERTON, LEYLAND, LANCASHIRE, PR26 9AX
Grid reference
Easting 346166, northing 420743
Licence area
North West England (ENWL)
Grid supply point
PENWORTHAM WEST
Bulk supply point
WRIGHTINGTON
Primary substation
TARLETON
Connection voltage
11 kV
Technology group
Storage
Energy source 1
BATTERY STORAGE & WIND, BESS: 4.5 MW registered
Registered capacity
4.5 MW
Maximum export capacity
0 MW
Maximum import capacity
0 MW
Change to maximum export capacity
4.5 MW
Change to maximum import capacity
4.5 MW
Flexible connection
Not stated
In a connection queue
Not stated
Date accepted
18 Sep 2025
Date connected
Not stated
Distribution reinforcement reference
Not published by ENWL
Transmission reinforcement reference
Not stated
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
15 Oct 2025
Tracked since
May 2026 edition

Change history

Tracked since the May 2026 edition, across 2 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at PENWORTHAM WEST

GSP view

1 other site at this grid supply point in the September 2026 edition. In all, the sites here total 29.5 MW: 29.5 MW accepted to connect.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose