QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.
Distribution / Sites / Customer

QE Development HoldCo

Customer named in the DNOs' registers

In UKPN's October 2026 and NGED's August 2026 editions

The registers spell this customer’s name more than one way: “QE Development HoldCo” (1 site), “QE Development Holdco Limited” (1 site), “Qe development holdco” (1 site) and “Qe development holdco ltd” (1 site).

4sites of 1 MW and over
233 MWcapacity
–connected (0 sites)
233 MWaccepted to connect (4 sites)

Capacity by DNO

DNOEditionSitesCapacityConnectedAccepted to connect
UKPNOctober 2026 edition2120 MW–120 MW
NGEDAugust 2026 edition2113 MW–113 MW

Capacity by technology

TechnologySitesCapacityConnectedAccepted to connect
Solar3170 MW–170 MW
Wind163 MW–63 MW

Each site is grouped by its first energy source, as the register names it.

Sites

Each site under this name in the DNOs' latest editions, the largest first.

Site, company and substation names are shown as they appear in the registers, including capitalisation.

SiteDNOGrid supply pointTechnologyStatusMW
Lundys farmNGEDWalpole 132Kv S StnWindAccepted to connect63
Gascoyne Solar FarmUKPNBrimsdown (EPN)SolarAccepted to connect60
Thurstons FarmUKPNPelhamSolarAccepted to connect60
SomerwoodNGEDShrewsbury 132Kv S StnSolarAccepted to connect49.9

Grid supply points

Each grid supply point its sites are at, with the capacity of its own sites there.

Grid supply pointDNOSitesConnectedAccepted to connect
Walpole 132Kv S StnNGED1–63 MW
Brimsdown (EPN)UKPN1–60 MW
PelhamUKPN1–60 MW
Shrewsbury 132Kv S StnNGED1–49.9 MW

What changed recently

Changes to its sites found in both of two consecutive monthly editions of their DNO's register, the latest first.

UKPN, September 2026 edition to October 2026 edition, for this customer's sites: 2 sites matched. Every September site and every October site had a match in the other edition.

NGED: QueueWatch holds one edition of its register so far, the August 2026 edition, so there is nothing to compare yet.

No change to the status, capacity, technology or customer of its sites in the editions QueueWatch holds.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose