Distribution / Sites / Customer

Peel Environmental

Customer named in the DNOs' registers

In SPEN's September 2026 edition

5sites of 1 MW and over
146 MWcapacity
53 MWconnected (1 sites)
93 MWaccepted to connect (4 sites)

Capacity by DNO

DNOEditionSitesCapacityConnectedAccepted to connect
SPENSeptember 2026 edition5146 MW53 MW93 MW

Capacity by technology

TechnologySitesCapacityConnectedAccepted to connect
Bioenergy and waste382.4 MW53 MW29.4 MW
Gas and other fossil153 MW–53 MW
Storage111 MW–11 MW

Each site is grouped by its first energy source, as the register names it.

Sites

Each site under this name in the DNOs' latest editions, the largest first.

Site, company and substation names are shown as they appear in the registers, including capitalisation.

SiteDNOGrid supply pointTechnologyStatusMW
Protos Park G1SPENInceBioenergy and wasteConnected53
Protos Park G3SPENInceGas and other fossilAccepted to connect53
Protos Park G2SPENInceBioenergy and wasteAccepted to connect27.84
Protos Park G4SPENInceStorageAccepted to connect11
North Clyde Recycling Centre (Resubmission)SPENDrumchapelBioenergy and wasteAccepted to connect1.6

Grid supply points

Each grid supply point its sites are at, with the capacity of its own sites there.

Grid supply pointDNOSitesConnectedAccepted to connect
InceSPEN453 MW92 MW
DrumchapelSPEN1–1.6 MW

What changed recently

Changes to its sites found in both of two consecutive monthly editions of their DNO's register, the latest first.

SPEN, August 2026 edition to September 2026 edition, for this customer's sites: 5 sites matched. Every August site and every September site had a match in the other edition.

No change to the status, capacity, technology or customer of its sites in the editions QueueWatch holds.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose