ELECTRICITY NORTH WEST (CONSTRUCTION & MAINTENANCE) LTD
Customer named in the DNOs' registers
In ENWL's September 2026 edition
Capacity by DNO
| DNO | Edition | Sites | Capacity | Connected | Accepted to connect |
|---|---|---|---|---|---|
| ENWL | September 2026 edition | 3 | 38.3 MW | 15.8 MW | 22.5 MW |
Capacity by technology
| Technology | Sites | Capacity | Connected | Accepted to connect |
|---|---|---|---|---|
| Gas and other fossil | 2 | 22.5 MW | 15.8 MW | 6.7 MW |
| Storage | 1 | 15.8 MW | – | 15.8 MW |
Each site is grouped by its first energy source, as the register names it.
Sites
Each site under this name in the DNOs' latest editions, the largest first.
Site, company and substation names are shown as they appear in the registers, including capitalisation.
| Site | DNO | Grid supply point | Technology | Status | MW |
|---|---|---|---|---|---|
| AGECROFT | ENWL | KEARSLEY 132 GSP | Gas and other fossil | Connected | 15.789 |
| SLACK LANE, WESTHOUGHTON | ENWL | KEARSLEY 132 GSP | Storage | Accepted to connect | 15.789 |
| OCTAGON HOUSE EC2 | ENWL | BREDBURY GSP | Gas and other fossil | Accepted to connect | 6.72 |
Grid supply points
Each grid supply point its sites are at, with the capacity of its own sites there.
| Grid supply point | DNO | Sites | Connected | Accepted to connect |
|---|---|---|---|---|
| KEARSLEY 132 GSP | ENWL | 2 | 15.8 MW | 15.8 MW |
| BREDBURY GSP | ENWL | 1 | – | 6.7 MW |
What changed recently
Changes to its sites found in both of two consecutive monthly editions of their DNO's register, the latest first.
ENWL, May 2026 edition to September 2026 edition, for this customer's sites: 3 sites matched. Every May site and every September site had a match in the other edition.
No change to the status, capacity, technology or customer of its sites in the editions QueueWatch holds.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose