USKMOUTH ENERGY STORAGE LIMITED
Customer named in the TEC register
Projects
| Project | Connection site | Technology | Queued MW | Connection date | Gate | Status |
|---|---|---|---|---|---|---|
| Uskmouth | Uskmouth 132kV Substation | Storage | 0 | Connected | Not stated | Built |
Recent changes
- UskmouthEngland and Wales, Storage350 MW now connectedConnected
- UskmouthEngland and Wales, StorageStatus changed from Under Construction/Commissioning to Built
- UskmouthEngland and Wales, StorageRestructured from 2 stages (230 MW from 30 Jun 2024, 120 MW from 30 Oct 2038) to 1 stage (350 MW from 31 Mar 2025). First connection date +9 months+9 mo
- UskmouthEngland and Wales, StorageRestructured from 1 stage (230 MW connected) to 2 stages (230 MW from 30 Jun 2024, 120 MW from 30 Oct 2038)
- UskmouthEngland and Wales, StorageTechnology changed from Coal to Storage
- UskmouthEngland and Wales, StorageRenamed from Uskmouth Battery Energy Storage
- UskmouthEngland and Wales, StorageConnection point changed from Uskmouth 275kV Substation to Uskmouth 132kV Substation
- UskmouthEngland and Wales, StorageRenamed from Uskmouth
- UskmouthEngland and Wales, StorageConnection point changed from Uskmouth 132kV to Uskmouth 275kV Substation
- UskmouthEngland and Wales, StorageTechnology changed from Storage to Coal
- UskmouthEngland and Wales, StorageCustomer changed from SIMEC USKMOUTH POWER LIMITED to USKMOUTH ENERGY STORAGE LIMITED
- UskmouthEngland and Wales, StorageTechnology changed from Coal to Storage
Price what a delay would do to your project
QueueWatch reports what changed in the public TEC register. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?