Limekiln Extension Limited
Customer named in the TEC register
Projects
| Project | Connection site | Technology | Queued MW | Connection date | Gate | Status |
|---|---|---|---|---|---|---|
| Limekiln | Limekilns 132/33kV substation | Storage with solar or wind | 61 | 1 Dec 2030 | Gate 1 | Scoping |
Recent changes
- LimekilnNorth Scotland, Storage with solar or windStage 2: Status changed from Consents Approved to Scoping
- LimekilnNorth Scotland, Storage with solar or windStage 2: Marked as Gate 1
- LimekilnNorth Scotland, Storage with solar or windRestructured from 1 stage (106 MW from 30 Apr 2024) to 2 stages (61 MW from 1 Dec 2030, 106 MW connected). First connection date +79 months+79 mo
- LimekilnNorth Scotland, Storage with solar or windTechnology changed from Onshore wind to Storage, Onshore wind
- LimekilnNorth Scotland, Storage with solar or windCustomer changed from LIMEKILN GRID LIMITED to Limekiln Extension Limited
- LimekilnNorth Scotland, Storage with solar or windRestructured from 2 stages (84 MW from 1 Oct 2022, 22 MW from 31 Oct 2027) to 1 stage (106 MW from 30 Apr 2024). First connection date +19 months+19 mo
- LimekilnNorth Scotland, Storage with solar or windStage 1: Connection date moved from 10 Jan 2022 to 1 Oct 2022 (+9 months)+9 mo
Price what a delay would do to your project
QueueWatch reports what changed in the public TEC register. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?