ENSO GREEN HOLDINGS U LIMITED
Customer named in the TEC register
Projects
| Project | Connection site | Technology | Queued MW | Connection date | Gate | Status |
|---|---|---|---|---|---|---|
| Willington East 1 (Tertiary) | Willington East 400kV Substation | Storage with solar or wind | 47.5 | 30 Oct 2027 | Gate 1 | Scoping |
Recent changes
- Willington East 1 (Tertiary)England and Wales, Storage with solar or windConnection point changed from Willington East 400/33kV Substation to Willington East 400kV Substation
- Willington East 1 (Tertiary)England and Wales, Storage with solar or windMarked as Gate 1
- Willington East 1 (Tertiary)England and Wales, Storage with solar or windGate marking removed (was Gate 1)
- Willington East 1 (Tertiary)England and Wales, Storage with solar or windConnection point changed from Willington 400kV Substation to Willington East 400/33kV Substation
- Willington East 1 (Tertiary)England and Wales, Storage with solar or windMarked as Gate 1
- Willington East 1 (Tertiary)England and Wales, Storage with solar or windCustomer changed from ENSO GREEN HOLDINGS LIMITED to ENSO GREEN HOLDINGS U LIMITED
- Willington East 1 (Tertiary)England and Wales, Storage with solar or windRestructured from 2 stages (49.9 MW from 30 Jun 2025, 7.1 MW from 30 Jun 2027) to 1 stage (47.5 MW from 30 Oct 2027). First connection date +28 months+28 mo
- Willington East 1 (Tertiary)England and Wales, Storage with solar or windSubstation name updated in the register (from Willington East 400kV to Willington East 400kV Substation)
Price what a delay would do to your project
QueueWatch reports what changed in the public TEC register. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?