DRAX POWER LIMITED
Customer named in the TEC register
Projects
| Project | Connection site | Technology | Queued MW | Connection date | Gate | Status |
|---|---|---|---|---|---|---|
| Drax BECCS | Drax 400kV Substation | Thermal (gas, biomass, waste) | 3,906 | 30 Oct 2035 | Not stated | Scoping |
| Drax Power Station | Drax 400kV Substation | Thermal (gas, biomass, waste) | 0 | Connected | Not stated | Built |
Left the register since January 2021: Drax (CCGT) (1.2 GW), Drax (Coal) (0 MW).
Recent changes
- Drax BECCSEngland and Wales, Thermal (gas, biomass, waste)Added to the registerNew
- Drax Power StationEngland and Wales, Thermal (gas, biomass, waste)2,001 MW now connectedConnected
- Drax Power StationEngland and Wales, Thermal (gas, biomass, waste)Capacity changed from 1,905 MW to 3,906 MW
- Drax Power StationEngland and Wales, Thermal (gas, biomass, waste)Renamed from Drax (Biomass)
- Drax (Coal)England and Wales, Thermal (gas, biomass, waste)Left the register (2,001 MW connected)0 MW
- Drax Power StationEngland and Wales, Thermal (gas, biomass, waste)Connection point changed from Drax to Drax 400kV Substation
- Drax (Coal)England and Wales, Thermal (gas, biomass, waste)Connection point changed from Drax to Drax 400kV Substation
- Drax (CCGT)England and Wales, Thermal (gas, biomass, waste)Left the register (1,190 MW from 1 Apr 2023)1,190 MW
- Drax (Coal)England and Wales, Thermal (gas, biomass, waste)Capacity changed from −65 MW to 0 MW
- Drax (Coal)England and Wales, Thermal (gas, biomass, waste)Connection date removed (was 1 Apr 2023)
- Drax (CCGT)England and Wales, Thermal (gas, biomass, waste)Connection date moved from 4 Jan 2023 to 1 Apr 2023 (+3 months)+3 mo
- Drax (Coal)England and Wales, Thermal (gas, biomass, waste)Connection date moved from 4 Jan 2023 to 1 Apr 2023
Price what a delay would do to your project
QueueWatch reports what changed in the public TEC register. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?