DEESIDE POWER (UK) LIMITED
Customer named in the TEC register
Projects
| Project | Connection site | Technology | Queued MW | Connection date | Gate | Status |
|---|---|---|---|---|---|---|
| Deeside Power Station | Connah's Quay 400kV Substation | Storage | 189 | 25 Oct 2026 Past date | Gate 2 | Built |
Recent changes
- Deeside Power StationEngland and Wales, StorageStatus changed from Consents Approved to Built
- Deeside Power StationEngland and Wales, StorageGiven a Gate 2 connection offerGate 2
- Deeside Power StationEngland and Wales, StorageConnection point changed from Deeside 400kV Substation to Connah's Quay 400kV Substation
- Deeside Power StationEngland and Wales, StorageConnection point changed from Connah's Quay 400kV Substation to Deeside 400kV Substation
- Deeside Power StationEngland and Wales, StorageTechnology changed from Storage, Gas engines to Storage, Reactive compensation
- Deeside Power StationEngland and Wales, Storage1 MW now connectedConnected
- Deeside Power StationEngland and Wales, StorageStatus changed from Scoping to Consents Approved
- Deeside Power StationEngland and Wales, Storage1 MW no longer connected
- Deeside Power StationEngland and Wales, StorageConnection point changed from Deeside 400kV Substation to Connah's Quay 400kV Substation
- Deeside Power StationEngland and Wales, StorageCapacity changed from 189 MW to 190 MW
- Deeside Power StationEngland and Wales, StorageStatus changed from Built to Scoping
- Deeside Power StationEngland and Wales, StorageTechnology changed from Storage, Reactive compensation to Storage, Gas engines
- Deeside Power StationEngland and Wales, StorageConnection date moved from 31 Oct 2033 to 25 Oct 2026 (−84 months)−84 mo
- Deeside Power StationEngland and Wales, StorageTechnology changed from Reactive compensation to Storage, Reactive compensation
- Deeside Power StationEngland and Wales, StorageCapacity changed from 0 MW to 189 MW
- Deeside Power StationEngland and Wales, StorageConnection date set to 31 Oct 2033
- Deeside Power StationEngland and Wales, StorageTechnology changed from Gas (CCGT) to Reactive compensation
Price what a delay would do to your project
QueueWatch reports what changed in the public TEC register. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?