Kype Muir 132/33kV
South Scotland, SP Energy Networks
The queue at this substation
| Project | Customer | Technology | Queued MW | Connection date | Gate | Status |
|---|---|---|---|---|---|---|
| Harting Rig Wind Farm | KYPE EXTENSION WIND FARM LIMITED | Onshore wind | 0 | Connected | Not stated | Built |
Recent changes
- Harting Rig Wind FarmSouth Scotland, Onshore windConnection point changed from Kype Muir 132kV Substation to Kype Muir 132/33kV
- Harting Rig Wind FarmSouth Scotland, Onshore windConnection point changed from Harting Rig 132/33kV Substation to Kype Muir 132kV Substation
- Harting Rig Wind FarmSouth Scotland, Onshore windCustomer changed from BANKS RENEWABLES (HARTING RIG WIND FARM) LIMITED to KYPE EXTENSION WIND FARM LIMITED
- Harting Rig Wind FarmSouth Scotland, Onshore windSubstation name updated in the register (from Harting Rig 132/33kV to Harting Rig 132/33kV Substation)
- Harting Rig Wind FarmSouth Scotland, Onshore wind67.2 MW now connectedConnected
- Harting Rig Wind FarmSouth Scotland, Onshore windStatus changed from Consents Approved to Built
- Harting Rig Wind FarmSouth Scotland, Onshore windConnection date moved from 9 Dec 2022 to 12 Sep 2022 (−3 months)−3 mo
Price what a delay would do to your project
QueueWatch reports what changed in the public TEC register. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?