Hornsea Power Station 2C Offshore platform Substation
England and Wales, National Grid Electricity Transmission
The queue at this substation
| Project | Customer | Technology | Queued MW | Connection date | Gate | Status |
|---|---|---|---|---|---|---|
| Hornsea Power Station 2C | SONNINGMAY WIND LIMITED | Offshore wind | 0 | Connected | Not stated | Built |
Recent changes
- Hornsea Power Station 2CEngland and Wales, Offshore wind440 MW now connectedConnected
- Hornsea Power Station 2CEngland and Wales, Offshore windSubstation name updated in the register (from Hornsea Power Station 2C Offshore platform to Hornsea Power Station 2C Offshore platform Substation)
- Hornsea Power Station 2CEngland and Wales, Offshore windStatus changed from Under Construction/Commissioning to Built
- Hornsea Power Station 2CEngland and Wales, Offshore windConnection date moved from 10 Jan 2021 to 1 Oct 2021 (+9 months)+9 mo
Price what a delay would do to your project
QueueWatch reports what changed in the public TEC register. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?