Drinkstone Hybrid 132/33kV substation

South Scotland, SP Energy Networks

1project in the register
55 MWstill to connect
0 MWof that with Gate 2 offers
0 MWconnected now

The queue at this substation

ProjectCustomerTechnologyQueued MWConnection dateGateStatus
Drinkstone HybridBUCCLEUCH ESTATES, LTD. (THE)Storage with solar or wind551 Jul 2035Gate 1Scoping

Recent changes

  • Drinkstone HybridSouth Scotland, Storage with solar or windConnection point changed from Hawick 132kV Substation to Drinkstone Hybrid 132/33kV substation
  • Drinkstone HybridSouth Scotland, Storage with solar or windMarked as Gate 1
QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the public TEC register. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose