Loch Kemp PSH
LOCH KEMP STORAGE LIMITED at Loch Kemp 275kV Switching Station
- Connection date
- 31 Oct 2030
- Gate
- Not stated
- Status
- Scoping
- Technology
- Pumped storage
- Total capacity
- 660 MW
- Connected now
- 0 MW
- Still to connect
- 660 MW
- Transmission owner
- SSEN Transmission (SHET)
- Agreement type
- Direct Connection
- Region
- North Scotland
- Project number
- PRO-002285
- In the register since
- April 2023
Change history
Every change to this project across 151 registers from 29 Jan 2021 to 5 Nov 2026.
- 30 May 2025 registerRenamed from Loch Kemp PSH Phase 2
- 30 May 2025 registerCustomer changed from STATERA ENERGY LIMITED to LOCH KEMP STORAGE LIMITED
- 30 May 2025 registerConnection point changed from Loch Kemp 275kV substation to Loch Kemp 275kV Switching Station
- 30 May 2025 registerCapacity changed from 300 MW to 660 MW
- 28 Apr 2023 registerAdded to the register
Also at Loch Kemp 275kV Switching Station
Substation viewNo other projects in the register at this connection point.