Mablethorpe Storage
THEDDLETHORPE FLEXIBLE GENERATION LIMITED at Lincolnshire Coastal Node 400kV Substation
- Connection date
- 30 Nov 2031
- Gate
- Not stated
- Status
- Scoping
- Technology
- Gas (CCGT) + Storage
- Total capacity
- 1,500 MW
- Connected now
- 0 MW
- Still to connect
- 1,500 MW
- Transmission owner
- National Grid Electricity Transmission (NGET)
- Agreement type
- Direct Connection
- Region
- England and Wales
- Project number
- PRO-001979
- In the register since
- September 2022
Change history
Every change to this project across 151 registers from 29 Jan 2021 to 5 Nov 2026.
- 27 Jan 2026 registerConnection point changed from Mablethorpe 400kV Substation to Lincolnshire Coastal Node 400kV Substation
- 30 May 2025 registerTechnology changed from Gas (CCGT), Demand to Gas (CCGT), Storage
- 29 Apr 2025 registerCustomer changed from STATERA ENERGY LIMITED to THEDDLETHORPE FLEXIBLE GENERATION LIMITED
- 23 Dec 2022 registerSubstation name updated in the register (from Mablethorpe 400kV to Mablethorpe 400kV Substation)
- 30 Sep 2022 registerAdded to the register
Also at Lincolnshire Coastal Node 400kV Substation
Substation viewNo other projects in the register at this connection point.