QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Ridham Dock

Clean Earth Energy Limited at Kemsley

UKPN Embedded Capacity Register 2 – 1MW and above, October 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not stated
Status
Accepted to connect
Customer
Clean Earth Energy Limited
Site name
Ridham Dock
Address
Kemsley Fields Business Park, Iwade, Sittingbourne, Kent, ME9 8SR
Grid reference
Easting 591947, northing 168171
Licence area
South Eastern Power Networks (SPN)
Grid supply point
Kemsley
Bulk supply point
Grovehurst
Primary substation
Grovehurst
Connection voltage
11 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 3.06 MW registered
Energy source 2
Wind, Onshore Wind Turbines: 3.06 MW registered
Registered capacity
3.06 MW
Change to maximum export capacity
3.06 MW
Change to maximum import capacity
0.1 MW
Flexible connection
No
In a connection queue
Yes
Date accepted
19 May 2025
Date connected
Not stated
Distribution reinforcement reference
Not published by UKPN
Transmission reinforcement reference
Not published by UKPN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
13 Jun 2025
Tracked since
October 2026 edition

Change history

Tracked since the October 2026 edition.

Another record at this location is on a separate page.

Changes to its status, capacity, technology or customer, newest first.

No changes to show: it has been found in one edition.

Also at Kemsley

GSP view

27 other sites at this grid supply point in the October 2026 edition. In all, the sites here total 534 MW: 284 MW connected, 250 MW accepted to connect.

See all 27

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose