Andershaw Windfarm
Andershaw Wind Power Ltd at Linnmill
SPEN Embedded Capacity Register >1MW, June 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 31 Oct 2028
- Status
- Accepted to connect
- Customer
- Andershaw Wind Power Ltd
- Site name
- Andershaw Windfarm
- Address
- Andershaw Wind Farm, Crawfordjohn, Lanark, South Lanarkshire, ML12 6ZS
- Grid reference
- Easting 284709, northing 626009
- Licence area
- Central and Southern Scotland (SPD)
- Grid supply point
- Linnmill
- Bulk supply point
- Not stated
- Primary substation
- Not stated
- Connection voltage
- 33 kV
- Technology group
- Wind
- Energy source 1
- Wind, Onshore wind turbines: 36 MW registered
- Registered capacity
- 36 MW
- Change to maximum export capacity
- 36 MW
- Change to maximum import capacity
- 0 MW
- Flexible connection
- No
- In a connection queue
- Yes
- Date accepted
- Not stated
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SPEN
- Transmission reinforcement reference
- Not stated
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 4 Apr 2023
- Tracked since
- June 2026 edition
Change history
Found in the June 2026 edition only.
Another record at this location is on a separate page.
Changes to its status, capacity, technology or customer, newest first.
- July 2026 editionNot found in this edition by its MPAN, grid reference or name and postcode
No changes to show: it has been found in one edition.
Also at Linnmill
GSP view14 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 216 MW: 120 MW connected, 96 MW accepted to connect.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose