GLEAN EOGHAINN WIND
SSEN Embedded Capacity Register, April 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 30 Nov 2029
- Status
- Accepted to connect
- Customer
- RES LIMITED
- Site name
- GLEAN EOGHAINN WIND
- Address
- GLEAN EOGHAINN WIND, EAST OF DUNVEGAN DUNVEGAN, ISLE OF SKYE, HIGHLAND, IV55 8GS
- Grid reference
- Easting 127339, northing 848016
- Licence area
- North of Scotland (SHEPD)
- Grid supply point
- DUNVEGAN GRID
- Bulk supply point
- Not stated
- Primary substation
- DUNVEGAN GRID
- Connection voltage
- 33 kV
- Technology group
- Wind
- Energy source 1
- WIND, ONSHORE WIND TURBINES: 35 MW registered
- Registered capacity
- 35 MW
- Change to maximum export capacity
- 25 MW
- Change to maximum import capacity
- 10.004 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- 29 Mar 2019
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 10 Feb 2026
- Tracked since
- April 2026 edition
Change history
Found in the April 2026 edition only.
Another record at this location is on a separate page.
Changes to its status, capacity, technology or customer, newest first.
- May 2026 editionNot found in this edition by its MPAN, grid reference or name and postcode
No changes to show: it has been found in one edition.
Also at DUNVEGAN GRID
GSP view4 other sites at this grid supply point in the September 2026 edition, 3 of them at DUNVEGAN GRID, the same primary substation. In all, the sites here total 88 MW: 28 MW connected, 60 MW accepted to connect.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose