Terry Street Hybrid
Terry Street Hybrid at Wincobank
Northern Powergrid Embedded Capacity Register 1MW and Over, March 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- Not published by Northern Powergrid
- Status
- Accepted to connect
- Customer
- Terry Street Hybrid
- Site name
- Terry Street Hybrid
- Address
- The Technology Building, 9 Terry Street, Sheffield, West Yorkshire, S9 2BU
- Grid reference
- Easting 438542, northing 389557
- Licence area
- Yorkshire (Northern Powergrid)
- Grid supply point
- Wincobank
- Bulk supply point
- Wincobank
- Primary substation
- Tinsley Park Road
- Connection voltage
- 11 kV
- Technology group
- Storage
- Energy source 1
- Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 0.999 MW registered, storage 1.98 MWh, 0.5 hours of storage
- Energy source 2
- Solar, Photovoltaic: 0.6 MW registered
- Registered capacity
- 1.599 MW
- Change to maximum export capacity
- 1.599 MW
- Change to maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- 14 Feb 2024
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 17 Feb 2025
- Tracked since
- March 2026 edition
Change history
Found in the March 2026 edition only.
Changes to its status, capacity, technology or customer, newest first.
- April 2026 editionNot found in this edition by its MPAN, grid reference or name and postcode
No changes to show: it has been found in one edition.
Also at Wincobank
GSP view2 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 43.8 MW: 43.8 MW connected.
- Templeborough BiomassTempleborough Biomass, Bioenergy and waste, Templeborough Biomass primaryConnected42.75 MW
- University of Sheffield BESSUniversity of Sheffield BESS, Storage, Waverley Business Park primaryConnected1 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose