QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Meadowfield Solar

Meadowfield Solar at Stella South

Northern Powergrid Embedded Capacity Register 1MW and Over, August 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not published by Northern Powergrid
Status
Accepted to connect
Customer
Meadowfield Solar
Site name
Meadowfield Solar
Address
Meadowfield Farm, Kibblesworth, Gateshead, Tyne and Wear, NE11 0YJ
Grid reference
Easting 424646, northing 556874
Licence area
North East (Northern Powergrid)
Grid supply point
Stella South
Bulk supply point
Meadowfield Solar
Primary substation
Meadowfield Solar Direct
Connection voltage
132 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 41 MW registered
Registered capacity
41 MW
Change to maximum export capacity
41 MW
Change to maximum import capacity
Not stated
Flexible connection
Yes
In a connection queue
Not published by Northern Powergrid
Date accepted
18 Oct 2023
Date connected
Not stated
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
12 Feb 2024
Tracked since
August 2026 edition

Change history

Found in the August 2026 edition only.

Another record at this location is on a separate page.

Changes to its status, capacity, technology or customer, newest first.

  • September 2026 edition
    Not found in this edition by its MPAN, grid reference or name and postcode

No changes to show: it has been found in one edition.

Also at Stella South

GSP view

30 other sites at this grid supply point in the September 2026 edition, 2 of them at Meadowfield Solar Direct, the same primary substation. In all, the sites here total 1.1 GW: 42.4 MW connected, 1.1 GW accepted to connect.

See all 30

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose