Meadowfield Solar
Meadowfield Solar at Stella South
Northern Powergrid Embedded Capacity Register 1MW and Over, April 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- Not published by Northern Powergrid
- Status
- Accepted to connect
- Customer
- Meadowfield Solar
- Site name
- Meadowfield Solar
- Address
- Meadowfield Farm, Kibblesworth, Gateshead, Tyne and Wear, NE11 0YJ
- Grid reference
- Easting 424646, northing 556874
- Licence area
- North East (Northern Powergrid)
- Grid supply point
- Stella South
- Bulk supply point
- Meadowfield Solar
- Primary substation
- Meadowfield Solar Direct
- Connection voltage
- 132 kV
- Technology group
- Solar
- Energy source 1
- Solar, Photovoltaic: 41 MW registered
- Registered capacity
- 41 MW
- Change to maximum export capacity
- 41 MW
- Change to maximum import capacity
- Not stated
- Flexible connection
- Yes
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- 18 Oct 2023
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 12 Feb 2024
- Tracked since
- April 2026 edition
Change history
Found in the April 2026 edition only.
Another record at this location is on a separate page.
Changes to its status, capacity, technology or customer, newest first.
- May 2026 editionNot found in this edition by its MPAN, grid reference or name and postcode
No changes to show: it has been found in one edition.
Also at Stella South
GSP view30 other sites at this grid supply point in the September 2026 edition, 2 of them at Meadowfield Solar Direct, the same primary substation. In all, the sites here total 1.1 GW: 42.4 MW connected, 1.1 GW accepted to connect.
- Meadowfield SolarMeadowfield Solar Additional Solar, Solar, Meadowfield Solar Direct primaryAccepted16.9 MW
- Newcastle Battery StorageNewcastle Battery Storage, Storage, Newcastle BESS Direct primaryAccepted99.8 MW
- Maiden Hill Farm BESSMaiden Hill Farm BESS, Storage, Maiden Hill Farm BESS Direct primaryAccepted99.4 MW
- Old Neolith Building BESSOld Neolith Building BESS, Storage, Old Neolith Building BESS Direct primaryAccepted96.24 MW
- Harperley Lane Solar & BESSHarperley Lane Solar & BESS, Storage, Harperley Lane Direct primaryAccepted92.9 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose