QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Hull Bank Farm BESS

Hull Bank Farm BESS at Creyke Beck 2 (Future)

Northern Powergrid Embedded Capacity Register 1MW and Over, March 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not published by Northern Powergrid
Status
Accepted to connect
Customer
Hull Bank Farm BESS
Site name
Hull Bank Farm BESS
Address
Hull Bank Farm, Beverley Road, Dunswell, East Riding of Yorkshire, HU6 0AA
Grid reference
Easting 507322, northing 434776
Licence area
Yorkshire (Northern Powergrid)
Grid supply point
Creyke Beck 2 (Future)
Bulk supply point
Hull Bank Farm BESS
Primary substation
Hull Bank Farm BESS Direct
Connection voltage
132 kV
Technology group
Storage
Energy source 1
Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 99.9 MW registered, storage 250 MWh, 2.5 hours of storage
Registered capacity
99.9 MW
Change to maximum export capacity
99.9 MW
Change to maximum import capacity
94.905 MW
Flexible connection
Yes
In a connection queue
Not published by Northern Powergrid
Date accepted
18 Feb 2025
Date connected
Not stated
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
6 Mar 2025
Tracked since
March 2026 edition

Change history

Found in the March 2026 edition only.

Changes to its status, capacity, technology or customer, newest first.

  • April 2026 edition
    Not found in this edition by its MPAN, grid reference or name and postcode

No changes to show: it has been found in one edition.

Also at Creyke Beck 2 (Future)

GSP view

No other site in Northern Powergrid's September 2026 edition is at this grid supply point.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose