Broadway House Farm
Broadway House Farm PV at Blyth 66kV
Northern Powergrid Embedded Capacity Register 1MW and Over, June 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- Not published by Northern Powergrid
- Status
- Accepted to connect
- Customer
- Broadway House Farm PV
- Site name
- Broadway House Farm
- Address
- Broadway House Farm, Church Lane, Bedlington, Northumberland, NE22 5RS
- Grid reference
- Easting 425975, northing 581272
- Licence area
- North East (Northern Powergrid)
- Grid supply point
- Blyth 66kV
- Bulk supply point
- Blyth 66kV
- Primary substation
- Broadway House Farm PV
- Connection voltage
- 66 kV
- Technology group
- Solar
- Energy source 1
- Solar, Photovoltaic: 50 MW registered
- Registered capacity
- 50 MW
- Change to maximum export capacity
- 50 MW
- Change to maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- 15 Sep 2021
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 7 May 2024
- Tracked since
- June 2026 edition
Change history
Found in the June 2026 edition only.
Another record at this location is on a separate page.
Changes to its status, capacity, technology or customer, newest first.
- July 2026 editionNot found in this edition by its MPAN, grid reference or name and postcode
No changes to show: it has been found in one edition.
Also at Blyth 66kV
GSP view25 other sites at this grid supply point in the September 2026 edition, 1 of them at Broadway House Farm PV, the same primary substation. In all, the sites here total 602 MW: 140 MW connected, 462 MW accepted to connect.
- Blyth Offshore WindfarmBlyth Offshore Wind Farm - Remaining Buildout, Wind, Blyth Offshore Windfarm primaryAccepted58.4 MW
- Blyth Offshore WindfarmBlyth Offshore Windfarm - Currently Installed, Wind, Blyth Offshore Windfarm primaryConnected41.5 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose