RENEWCO POWER LIMITED
Customer named in the TEC register
Projects
| Project | Connection site | Technology | Queued MW | Connection date | Gate | Status |
|---|---|---|---|---|---|---|
| M74 West Wind Farm | M74 West Wind Farm 132kV | Storage with solar or wind | 180 | 31 Oct 2029 | Not stated | Scoping |
| Ravengill Renewable Energy Park | Elvanfoot 275/132/33kV | Storage with solar or wind | 250 | 31 Oct 2036 | Not stated | Scoping |
| Watchman Energy Park | Watchman 132kV Substation | Storage with solar or wind | 250 | 31 Oct 2036 | Not stated | Scoping |
| Lessnessock Energy Park | LESSNESSOCK ENERGY PARK 132KV SUBSTATION | Storage | 114 | 30 Oct 2037 | Gate 1 | Scoping |
| Clyde South Energy Park | Redshaw 132kV Substation. | Storage with solar or wind | 120 | 31 Oct 2037 | Gate 1 | Scoping |
Recent changes
- Clyde South Energy ParkSouth Scotland, Storage with solar or windMarked as Gate 1
- Lessnessock Energy ParkSouth Scotland, StorageConnection point changed from Lessnessock to LESSNESSOCK ENERGY PARK 132KV SUBSTATION
- Lessnessock Energy ParkSouth Scotland, StorageMarked as Gate 1
- Clyde South Energy ParkSouth Scotland, Storage with solar or windConnection point changed from Elvanfoot 275/132/33kV to Redshaw 132kV Substation.
- Clyde South Energy ParkSouth Scotland, Storage with solar or windAdded to the registerNew
- M74 West Wind FarmSouth Scotland, Storage with solar or windCapacity changed from 250 MW to 180 MW
- M74 West Wind FarmSouth Scotland, Storage with solar or windConnection date moved from 27 Oct 2028 to 31 Oct 2029 (+12 months)+12 mo
- M74 West Wind FarmSouth Scotland, Storage with solar or windTechnology changed from Storage, Onshore wind to Storage, Solar, Onshore wind
- Lessnessock Energy ParkSouth Scotland, StorageAdded to the registerNew
- Watchman Energy ParkSouth Scotland, Storage with solar or windConnection point changed from Elvanfoot 275/132/33kV to Watchman 132kV Substation
- Ravengill Renewable Energy ParkSouth Scotland, Storage with solar or windAdded to the registerNew
- Watchman Energy ParkSouth Scotland, Storage with solar or windAdded to the registerNew
- M74 West Wind FarmSouth Scotland, Storage with solar or windAdded to the registerNew
Price what a delay would do to your project
QueueWatch reports what changed in the public TEC register. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose