ORSTED POWER (UK) LIMITED
Customer named in the TEC register
Projects
| Project | Connection site | Technology | Queued MW | Connection date | Gate | Status |
|---|
Left the register since January 2021: New Project One (ONP01) (1.5 GW), New Project Two (ONP02) (1.5 GW), OSP01 (1.8 GW), Race Bank Extension (565 MW), OSP02 (1.8 GW), Orsted Celtic Sea (OCS01) (1.4 GW), Orsted Celtic Sea 2 (OCS02) (1.4 GW).
Recent changes
- Orsted Celtic Sea (OCS01)England and Wales, Offshore windLeft the register (1,350 MW from 6 Dec 2036)1,350 MW
- Orsted Celtic Sea 2 (OCS02)England and Wales, Offshore windLeft the register (1,350 MW from 6 Dec 2036)1,350 MW
- Race Bank ExtensionEngland and Wales, Offshore windLeft the register (565 MW from 30 Apr 2030)565 MW
- Orsted Celtic Sea (OCS01)England and Wales, Offshore windConnection point changed from Pembroke 400kV Substation to Alverdiscott 400kV Substation
- Orsted Celtic Sea (OCS01)England and Wales, Offshore windAdded to the registerNew
- Orsted Celtic Sea 2 (OCS02)England and Wales, Offshore windAdded to the registerNew
- OSP01South Scotland, Offshore windLeft the register (1,800 MW from 31 Oct 2033)1,800 MW
- OSP02South Scotland, Offshore windLeft the register (1,800 MW from 31 Oct 2033)1,800 MW
- New Project One (ONP01)England and Wales, Offshore windLeft the register (1,500 MW from 1 Apr 2033)1,500 MW
- New Project One (ONP01)England and Wales, Offshore windConnection date moved from 4 Jan 2033 to 1 Apr 2033 (+3 months)+3 mo
- New Project Two (ONP02)England and Wales, Offshore windLeft the register (1,500 MW from 5 Jan 2032)1,500 MW
- OSP02South Scotland, Offshore windAdded to the registerNew
Price what a delay would do to your project
QueueWatch reports what changed in the public TEC register. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?