MOSSMORRAN ENERGY STORAGE LIMITED
Customer named in the TEC register
Projects
| Project | Connection site | Technology | Queued MW | Connection date | Gate | Status |
|---|---|---|---|---|---|---|
| Gresham House Mossmoran BESS | LOCH GELLY COLLECTOR 132KV SUBSTATION | Storage | 200 | 31 Oct 2031 | Not stated | Scoping |
Recent changes
- Gresham House Mossmoran BESSSouth Scotland, StorageCustomer changed from Gresham House Devco Pipeline Limited to MOSSMORRAN ENERGY STORAGE LIMITED
- Gresham House Mossmoran BESSSouth Scotland, StorageConnection point changed from Mossmorran 132/33kV to LOCH GELLY COLLECTOR 132KV SUBSTATION
- Gresham House Mossmoran BESSSouth Scotland, StorageConnection date moved from 30 Oct 2030 to 31 Oct 2031 (+12 months)+12 mo
- Gresham House Mossmoran BESSSouth Scotland, StorageCustomer changed from Gresham House Asset Management Limited to Gresham House Devco Pipeline Limited
- Gresham House Mossmoran BESSSouth Scotland, StorageConnection point changed from Mossmorran 275/132/33kV to Mossmorran 132/33kV
- Gresham House Mossmoran BESSSouth Scotland, StorageConnection point changed from Mossmoran 275kV Substation to Mossmorran 275/132/33kV
- Gresham House Mossmoran BESSSouth Scotland, StorageAdded to the registerNew
Price what a delay would do to your project
QueueWatch reports what changed in the public TEC register. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?