LEL BILBO SOLAR LIMITED
Customer named in the TEC register
Projects
| Project | Connection site | Technology | Queued MW | Connection date | Gate | Status |
|---|---|---|---|---|---|---|
| Bilbo Farm | Strichen 132/33kV GSP Substation | Storage with solar or wind | 67.1 | 30 Jun 2024 Past date −4 mo | Gate 2 | Under Construction/Commissioning |
Recent changes
- Bilbo FarmNorth Scotland, Storage with solar or windStage 1: Connection date moved from 31 Oct 2024 to 30 Jun 2024 (−4 months)−4 mo
- Bilbo FarmNorth Scotland, Storage with solar or windStage 2: Given a Gate 2 connection offerGate 2
- Bilbo FarmNorth Scotland, Storage with solar or windStage 2: Gate marking removed (was Gate 2)
- Bilbo FarmNorth Scotland, Storage with solar or windStage 1: Status changed from Scoping to Under Construction/Commissioning
- Bilbo FarmNorth Scotland, Storage with solar or windStage 1: Given a Gate 2 connection offerGate 2
- Bilbo FarmNorth Scotland, Storage with solar or windConnection point changed from Strichen GSP to Strichen 132/33kV GSP Substation
- Bilbo FarmNorth Scotland, Storage with solar or windStage 2: Given a Gate 2 connection offerGate 2
- Bilbo FarmNorth Scotland, Storage with solar or windStage 1: Technology changed from Solar to Storage, Solar
- Bilbo FarmNorth Scotland, Storage with solar or windStage 2: Technology changed from Solar to Storage, Solar
- Bilbo FarmNorth Scotland, Storage with solar or windRestructured from 1 stage (25 MW from 1 May 2021) to 2 stages (25 MW from 31 Oct 2024, 42.1 MW from 31 Oct 2033). First connection date +42 months+42 mo
- Bilbo FarmNorth Scotland, Storage with solar or windCustomer changed from GEA BILBO LIMITED to LEL BILBO SOLAR LIMITED
- Bilbo FarmNorth Scotland, Storage with solar or windSubstation name updated in the register (from Strichen to Strichen GSP)
- Bilbo FarmNorth Scotland, Storage with solar or windConnection date moved from 5 Jan 2021 to 1 May 2021 (+4 months)+4 mo
Price what a delay would do to your project
QueueWatch reports what changed in the public TEC register. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?