KINCARDINE OFFSHORE WINDFARM LIMITED
Customer named in the TEC register
Projects
| Project | Connection site | Technology | Queued MW | Connection date | Gate | Status |
|---|---|---|---|---|---|---|
| Kincardine Offshore Wind Farm | Redmoss GSP | Offshore wind | 0 | Connected | Not stated | Built |
Recent changes
- Kincardine Offshore Wind FarmNorth Scotland, Offshore windSubstation name updated in the register (from Redmoss 132/33kV Grid Supply Point Substation to Redmoss GSP)
- Kincardine Offshore Wind FarmNorth Scotland, Offshore wind0.6 MW now connectedConnected
- Kincardine Offshore Wind FarmNorth Scotland, Offshore windCapacity changed from 49 MW to 49.6 MW
- Kincardine Offshore Wind FarmNorth Scotland, Offshore wind0.6 MW no longer connected
- Kincardine Offshore Wind FarmNorth Scotland, Offshore windRestructured from 2 stages (47.6 MW from 4 Jan 2020, 2 MW connected) to 1 stage (49.6 MW connected)
Price what a delay would do to your project
QueueWatch reports what changed in the public TEC register. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?