GPC Project 16 Ltd
Customer named in the TEC register
Projects
| Project | Connection site | Technology | Queued MW | Connection date | Gate | Status |
|---|---|---|---|---|---|---|
| Bishopbriggs 500MW BESS | Bishopbriggs BESS 400/275kV Substation | Storage | 500 | 28 May 2029 | Not stated | Scoping |
Recent changes
- Bishopbriggs 500MW BESSSouth Scotland, StorageRenamed from Lambloch BESS
- Bishopbriggs 500MW BESSSouth Scotland, StorageCustomer changed from Apatura Battery Ltd to GPC Project 16 Ltd
- Bishopbriggs 500MW BESSSouth Scotland, StorageConnection point changed from Lambloch BESS 275kV Substation to Bishopbriggs BESS 400/275kV Substation
- Bishopbriggs 500MW BESSSouth Scotland, StorageTechnology changed from Storage to Demand, Storage
- Bishopbriggs 500MW BESSSouth Scotland, StorageConnection point changed from Busby 275kV to Lambloch BESS 275kV Substation
- Bishopbriggs 500MW BESSSouth Scotland, StorageCustomer changed from GPC Battery Ltd to Apatura Battery Ltd
- Bishopbriggs 500MW BESSSouth Scotland, StorageAdded to the registerNew
Price what a delay would do to your project
QueueWatch reports what changed in the public TEC register. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?