ELVANFOOT ENERGY STORAGE LIMITED
Customer named in the TEC register
Projects
| Project | Connection site | Technology | Queued MW | Connection date | Gate | Status |
|---|---|---|---|---|---|---|
| Elvanfoot (9.8 MW) Energy Storage | Elvanfoot 400/275/33kV | Storage | 9.8 | 30 Apr 2027 | Gate 2 | Consents Approved |
Left the register since January 2021: Elvanfoot Battery Storage - 55 (55 MW).
Recent changes
- Elvanfoot (9.8 MW) Energy StorageSouth Scotland, StorageStatus changed from Scoping to Consents Approved
- Elvanfoot (9.8 MW) Energy StorageSouth Scotland, StorageGiven a Gate 2 connection offerGate 2
- Elvanfoot (9.8 MW) Energy StorageSouth Scotland, StorageConnection date moved from 6 Dec 2024 to 30 Apr 2027 (+29 months)+29 mo
- Elvanfoot (9.8 MW) Energy StorageSouth Scotland, StorageConnection point changed from Elvanfoot 132kV/33kV Substation to Elvanfoot 400/275/33kV
- Elvanfoot (9.8 MW) Energy StorageSouth Scotland, StorageConnection point changed from Elvanfoot 33kV Substation to Elvanfoot 132kV/33kV Substation
- Elvanfoot Battery Storage - 55South Scotland, StorageLeft the register (55 MW from 30 Nov 2025)55 MW
- Elvanfoot (9.8 MW) Energy StorageSouth Scotland, StorageAdded to the registerNew
- Elvanfoot Battery Storage - 55South Scotland, StorageAdded to the registerNew
Price what a delay would do to your project
QueueWatch reports what changed in the public TEC register. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?