EDINTORE 2 WIND FARM (CAIRDS WOOD) - WIND

At KEITH

SSEN Embedded Capacity Register, March 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
30 Jun 2025
Status
Accepted to connect
Customer
Not stated
Site name
EDINTORE 2 WIND FARM (CAIRDS WOOD) - WIND
Address
EDINTORE 2 WIND FARM (CAIRDS WOOD), KEITH, MORAY, AB55 5FF
Grid reference
Easting 343101, northing 850672
Licence area
North of Scotland (SHEPD)
Grid supply point
KEITH
Bulk supply point
Not stated
Primary substation
KEITH GRID
Connection voltage
33 kV
Technology group
Wind
Energy source 1
WIND, ONSHORE WIND TURBINES: 16.8 MW registered
Registered capacity
16.8 MW
Change to maximum export capacity
0.5 MW
Change to maximum import capacity
0.5 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
5 May 2022
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
10 Feb 2026
Tracked since
August 2023 edition

Change history

Tracked from the August 2023 edition to the March 2026 edition, across 29 editions. Not found in the May 2025, June 2025 and July 2025 editions.

Changes to its status, capacity, technology or customer, newest first.

  • April 2026 edition
    Not found in this edition by its MPAN, grid reference or name and postcode
  • July 2025 edition
    Not found in this edition by its MPAN, grid reference or name and postcode
  • June 2025 edition
    Not found in this edition by its MPAN, grid reference or name and postcode
  • May 2025 edition
    Not found in this edition by its MPAN, grid reference or name and postcode

No change to its status, capacity, technology or customer.

Also at KEITH

GSP view

27 other sites at this grid supply point in the September 2026 edition, 23 of them at KEITH GRID, the same primary substation. In all, the sites here total 765 MW: 161 MW connected, 604 MW accepted to connect.

See all 27

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose